亚洲综合日韩无码久久,超高清欧美videosseⅹo,精品国产免费第一区二区三区日韩,午夜国产精品久久影院,亚洲国产中文精品无码久久一线北

您好,歡迎來(lái)到江浙滬招生考試網(wǎng) !

設(shè)為首頁(yè)|加入收藏|聯(lián)系我們|網(wǎng)站地圖|

江浙滬招生考試網(wǎng)

您現(xiàn)在的位置: test4exam >> 歷年真題 >> it認(rèn)證題庫(kù) >> 正文

Cisco 642-681 題庫(kù)

日期:2010/1/29 0:35:55 來(lái)源:本站原創(chuàng) 訪問(wèn)量:

Advanced Wireless LAN for System Engineers Exam

  • 科目編號(hào) : 642-681
  • 考題名稱(chēng) : Advanced Wireless LAN for System Engineers Exam
  • 題庫(kù)數(shù)目 : 93 Q&As

1. The CiscoWorks Wireless LAN Solution Engine uses which protocol for radio management?

A. CCKM

B. LWAPP

C. SNMP

D. WLCCP

Answer: D

 

2. Which two key features are unique to the controller-based feature set? (Choose two.)

A. fast secure roaming

B. rogue access point detection

C. access point participation in RF management

D. access point registration via digital certificate

E. dynamic RF control without a dedicated management platform

Answer: DE

 

3. The Newton manufacturing company has three facilities that are located in Columbia, South Carolina. The corporate office is located in an 11-story building downtown. The R&D facility is located on the north side of the city approximately 4 miles (6.4 km) from the corporate office in a five-story building. The manufacturing facility is located approximately 6 miles (9.6 km) to the northwest of the corporate office. Line of sight exists from the downtown office to all facilities. Users at the manufacturing plant require network connectivity for file sharing and e-mail, while the users at the R&D facility require high-speed Internet access with the ability to send large CAD drawings to the corporate office and large machine control files to the manufacturing facility. Presently, the manufacturing facility is connected to the corporate office by a 64-kbps leased line, and the R&D facility is connected to both the corporate office and the manufacturing facility by a dedicated T1 line. The company plans to add a second line of development at the R&D facility within the next 60 days. The current T1 lines are at a constant 70-percent utilization rate. The current projected lead time for installation of additional lines is 90 days if the current cable plant will support it.

A wireless bridging solution would provide which three benefits to the customer? (Choose three.)

A. rapid deployment

B. immunity to weather

C. increased bandwidth

D. guaranteed bandwidth

E. increased security

F. lower total cost of ownership

Answer: ACF

 

4. In a mesh network, what is the recommended hop-count limit of a mesh access point from its associated root access point?

A. 2

B. 4

C. 6

D. 8

Answer: B

 

5. How is a bridge group name used in a wireless mesh deployment?

A. It is used to retrieve the secret shared key.

B. It logically groups access points to avoid interference from neighboring mesh networks.

C. It is used as a password in communication preceding LWAPP.

D. It is used to join the outdoor mesh network with the controller mobility group.

Answer: B

你可以到cn.test4exam.com

相關(guān)閱讀
·推薦文章

Copyright ©2013-2015 江浙滬招生考試網(wǎng) All Rights Reserved.
地址: 蘇州市姑蘇區(qū)閶胥路483號(hào)(工投創(chuàng)業(yè)園)  電話:0512-85551931 郵編: 214000
郵箱: [email protected] 版權(quán)所有:蘇州邁峰教育科技有限公司 蘇ICP備15050684號(hào)-2